Total planning area is 3ha. It is aim to mainly develop the aquiculture and protect Aves in other circumscription of West Sea.
The transportation circumscription is for induction in early time, but for confining in later time.
The Study on Compartmentalization-circumscription of One-way Slab and Two-way Slab on Four Sides Retaining Slab;
Analysis on the circumscription of the heavy camion and its limited loading